Built Aura Building Contracting L.L.C

Architecture · Engineering · Construction

000

Residential tower, Sharjah

After careful consideration of the facade treatment, this scope of work covers the preparation of all engineering designs and documentation in full compliance with UAE safety regulations and statutory codes. The operations include the precise mechanical installation of stone cladding utilizing an approved angle system to ensure structural integrity and durability. All on-site execution is carried out strictly in accordance with approved architectural drawings, technical specifications, and highest standards of workmanship.

Typology
Residential tower
Client
Ahmed Mohamed Marzouq Saqer Almazrouei

The record

Residential tower

Sharjah — UAE

Client
Ahmed Mohamed Marzouq Saqer Almazrouei
Project
Proposed Building (G + 2P + 8 Typ. + HC)
Consultant
Next Engineering Consultants
Location
Sharjah — UAE
Typology
Residential tower
Status
Executed

Scope of work

After careful consideration of the facade treatment, this scope of work covers the preparation of all engineering designs and documentation in full compliance with UAE safety regulations and statutory codes. The operations include the precise mechanical installation of stone cladding utilizing an approved angle system to ensure structural integrity and durability. All on-site execution is carried out strictly in accordance with approved architectural drawings, technical specifications, and highest standards of workmanship.

Delivered

  • Engineering design & documentation
  • Approved angle system
  • UAE statutory compliance

Divisions engaged

Interested in working with us?

Shaping your future

Send the drawings, the plot or just the idea. We will tell you what it takes to build it — and what it costs — before you commit to anything.

Studio
Dubai — UAE

Why choose us

  • 01

    Professional & Experienced Team

    Architects and engineers who have carried projects from concept through handover.

  • 02

    High-Quality Materials

    Specified, submitted for approval and verified before anything is fixed.

  • 03

    Transparent Project Timeline

    A programme you can hold us to, reported against honestly.

  • 04

    Competitive Pricing

    Costed from measured quantities rather than allowances.